Missouri Route VV in Macon County, closed since 2024 after a routine inspection turned up structural deterioration, is scheduled for a full bridge replacement as early as Oct. 15, weather permitting. The closure runs between Arctic Road and Bison Street, about 0.4 miles south of Arctic Road where the route crosses BNSF Railway tracks; contractor Louis-Company, LLC is handling the $3.5 million project, expected to wrap by June 30, 2027. Motorists should continue following posted detour signs around the closure.
Source: MoDOT — Bridge Replacement Project Begins on Route VV in Macon County
Skip to content




















